Under a threatening sky, 180109 arrives at Charlbury on 1 March 2007 with the 13:23 Hereford to Paddington First Great Western service. Note the pile of concrete cable trough covers on the right, which are obviously desperately needed judging by the way the cables are strewn about at random all over the ballast at the side of the track. |