27024 Bridge of Dun 4 May 2008

27024 arrives at Bridge of Dun on 4 May 2008 with the 12:00 service from Brechin during the Caledonian Railway's Diesel Gala. The pile of track panels on the left stand on the course of the old line to Forfar, via Guthrie Junction. There was also originally a connection to Arbroath, via a curve at Friockheim.