Thomas Hill 4w DH 297V is pictured resting between duties at Bardon Hill Quarry on 15 September 2020. The loco was built in 1981 for ICI Billingham, and moved to the Aggregate Industries site at Bardon Hill in 1996. This photo is taken with a long lens from the A511 road level crossing. |