A busy scene of weekend engineering work at Uffington on 1 August 1993. Running wrong line, 37092 & 37158 slowly move forward with the Redland self-discharge train during track relaying operations. Another Class 37 waits on the down line, and several engineering vehicles and wagons are parked in the up loop. I had already taken a picture of 37158 & 37092 while they were in a photographable position on the other side of the bridge, but couldn't resist this picture, which also shows the new pointwork set out on the site of Uffington's former goods yard in the background. |