On 15 August 2009, 43031 pulls out of the down platform at Moreton-in-Marsh and runs 'wrong line' to the crossover, where it moves onto the up line. A few minutes earlier it had arrived with the 11:21 First Great Western service from Paddington, which would normally carry on to Great Malvern. However, the line from here to Evesham was closed for engineering works in connection with reinstating the double track, and a connection was being provided by buses. After the HST had moved onto the up line, it then proceeded back to the station (with 43193 leading), ready to form the 13:48 departure for Paddington. |