Work was well under way to reinstate the up relief line at Grove on 30 January 1994. A crane stands on the up main line, with jibs extended out over the course of the new line. 43136 approaches, running 'wrong line' on the down main with the 1A20 09:29 Weston-super-Mare to Paddington service. The line in the foreground is the then recently installed down relief, which during this Sunday engineering possession, was being used by all down trains. Photo taken from a public footpath crossing. |