43160 Sir Moir Lockhead OBE passes Uffington on 22 January 2017 with the 1G22 10:27 Paddington to Cheltenham Spa GWR service. The public footpath crossing, adjacent to the nearest electfrication mast has been closed for the third time in as many years, this time because of the Network Rail electfrication work site on the other side of the line. This location therefore now requires a long walk across the fields from the village of Uffington. |