43193 Denchworth 23 August 2016

The Great Western Mainline electrification marches on, although here, at Denchworth, the change is not so noticeable, as for many years a massive signal gantry has spanned the tracks. Also, as at most other spots, Network Rail have not yet installed the post next to the bridge. 43193 speeds westwards on 23 August 2016 with the 1B40 13:45 Paddington to Swansea GWR service.