59202 Alan Meddows Taylor MD, Mendip Rail Limited runs along the down relief line at Denchworth on 20 August 2014 with the 7C48 13:30 Appleford to Whatley Mendip Rail stone empties. One of the recently installed overhead electrification piles can be seen directly above the loco's cab. The black metal tube is capped with a temporary plywood cover. There are going to be thousands of redundant plywood discs shortly. I hope they will be disposed of environmentally! |