After almost coming to a stand under adverse signals near the site of Uffington station by the bridge in the background, 60071 Ribblehead Viaduct slowly gets the 6B33 13:35 Theale to Robeston empty Murco oil tanks moving again on 29 September 2011. The reason for the signal check was the fact that it was running just five minutes behind 59206 on the 7C54 stone empties. Two freight trains in five minutes and neither of them a red shed - perfect! |