66508 Wolvercote 12 July 2016

66508 passes the worksite for the reinstatement of the down relief line at Wolvercote, as it heads north on 12 July 2016 with the 6M28 18:25 Hinksey to Bescot engineer's working. On the right is Port Meadow, now separated from the line by a totally over the top palisade fence.