66588 Kemble 4 July 2024

Running 23 minutes late, 66588 passes Kemble on 4 July 2024 with the 4L33 10:29 Wentloog to London Gateway freightliner, which was diverted this way due to the closure of the Severn Tunnel for engineering works. A long lens is now required for this viewpoint, as vegetation is now encroaching on the tracks in the immediate foreground. Because of the use of a long lens, the houses and church tower in the village of Coates can be seen in the background, on the left.