Torrential rain (126.2mm was recorded at Brize Norton in 24 hours!) on 20 July 2007 resulted in numerous lines being closed due to flooding, and one week later the line through Oxford was still closed, resulting in various freight services being diverted via alternative routes. On 27 July, 66593 is pictured ambling down the relief line at Waltham St Lawrence (between Reading and Maidenhead) with the 4M55 08:58 Southampton to Lawley Street freightliner. This is not the usual location at Waltham St Lawrence, but from the footbridge in the fields towards Shottesbrooke. The bridge in the background is Chalkpit Bridge, on the bridleway between Waltham St Lawrence and Knowl Hill. |