The 1933 built LMS Blackford Signal Box is pictured on 17 April 2003. This box formerly controlled traffic on the busy A9 road between Striling and Perth, but since a bypass was built to take traffic away from the village, the level crossing on the Highland Mainline has become considerably quieter! |