Almost ready for the first trains. The brand new A4421 bridge at Launton, pictured on 11 May 2024. The new double track mainline is part of the East West Rail project, linking Oxford with Milton Keynes. This location was formerly a single track normally freight only line, and had become very overgrown, so much so that the slightly more head on view from 2018 is totally unrecognisable! |