Severn Tunnel Junction Yard, pictured on 30 June 1985. Note the huge variety of wagons types, and the still healthy level of traffic. At this time the yard was a main Speedlink hub, but two years later the entire site, and the adjacent loco depot, was closed. Gloucester took over a lot of the yard's work, until the Speedlink network was withdrawn in 1991. |