Brand new 150101 approaches Wellingborough on 12 December 1985 with a southbound crew training run. The two prototype Class 150s (150001 & 150002) had been introduced the previous year, and had spent a lot of time working test trains. 150101 was the first of the production units, and had only been delivered a few weeks before this picture was taken. |