After being briefly held at the signal in the background, 60020 The Willows slowly passes Standish Junction on 13 January 2022 with the 6B13 05:00 Robeston to Westerleigh oil tanks. It had been let out of Haresfield Loop (just around the corner), only to be met by a red signal, as the 1G11 10:28 Paddington to Cheltenham Spa GWR DMU was about to cross in front of it. |