Corris Railway 0-4-2ST No.7 stands on the new traverser at Corris station on 30 April 2022. The traverser, which was constructed by Statfold Engineering, Tamworth, enables locos to run round in the very cramped station site. It is operated manually, with two people pushing on removable posts at each end of the table. |